Manufacturing Process Manager (M.P.M)

Problems with conventional WO systems

Too much paper work following product round the shop floor

Excessive admin when creating works orders

   

Why MPM is different

Works Orders / Sheets are centred on the raw material and the actual base level requirements rather than top level Products. 

Each Product manufactured is provided a label which allows the product to be tracked and managed through the manufacturing process.

   

What Are MPM’s Advantages

●Programmers have an overall view of all requirements and their relation to the raw materials required.

●As the Programmers have a view of the total requirements they can reduce raw material waste by more efficiently using the space available on the raw material.

●MPM integrates directly with Sage 200 meaning that there is no double entry of stock, Bill Of materials, customers, sales order etc. in your accounting and manufacturing systems.

●Integration with the Wrightbus portal system means that users do not need to rebuild Wrightbus BOM’s in their manufacturing system as these can simply be imported.  This process can be performed as a batch operation or for individual BOMs.

●Wrightbus decree that goods which they receive should have a label with certain information.  MPM produces this label for you.  Wrightbus have also stipulated that these labels should use Wrightbus’s descriptions and revision numbers.  Due to the Wrightbus portal integration this is not a problem as these are simply imported into the users Sage 200 system.

●MPM shows buyers the total raw material required to satisfy all products being manufactured.  This allows the buyer to ensure that manufacturing should always have sufficient material to get the job done.

●Programmers and manufacturing can see what needs to be actioned and what state any current requirement is in.

●All products on the shop floor can be easily identified and anyone can see the next process involved in the manufacture of that product.

●Store personnel can understand what material they are receiving and the purpose of its manufacture.  Therefore allowing them to store, kit or despatch the product.

●MPM allows sage to present accurate current stocks. These stocks can be broken down into two distinct types ‘true stock’ (i.e. product not currently required for an order) and product awaiting kit/despatch

●With true stock control a scheduler can manufacture product where there is a true requirement NOT the products for which there is currently free stock.

●Provide your customer with true product delivery dates.

●Ensure you programmers are always manufacturing the correct revision of the product.


MPM Costs

   

Prerequisites

Sage 200

Sage 200 Commercials

Sage BOM module (Included In Sage Costing)

SQL server (included in sage 200 install)

   

Software £5000

MPM which includes:-

Wrightbus Portal integration for stock items, revisions and BOMS

Control Requirements, Control Manufacturing, Sheet search and BOM integration.

Same number of MPM users as sage users

Provided sage users are bought from Acorn IT Solutions

Wrightbus Kitting and Order Import

This allow users to import Wrightbus kitting sheets and emailed orders into a Sage 200 Sales Order.

   

Software Support £1000

This includes ongoing support and any functionality developed by user group (Indicators, Hutchinson’s and McCauley’s)

   

Services £1350

●Base system install: - ½ day

Creation of tables, stored procedures, views, installation and configuration of MPM client on computers

●Creation of all Wrightbus stock codes: - ¼ day

Use Wrightbus portal and MPM to create any product which are not in you stock system.

●Initial creation of all Wrightbus BOMS: - ¼ day

Use Wrightbus portal and MPM to create/update BOM which are not in your sage BOM module.

●Configuration of sage stock enquiry/amend screen: - ¼ day

Add ability for user to view raw material, qty required of raw material and current revision number relative to each product in sage stock enquiry screen

●Import and configuration of Raw Materials and sheet sizes: - ¼ day

Client provided completed spread sheets of raw materials and their size to be available in MPM.  These are then imported.

●Import of Processes to be available in MPM: - ¼ day

Client provides completed spread sheets of processes to be available in MPM.  These are then imported.

●Configuration of MPM Stationary layouts: - ¼ day

Any changes to labels / sheets

●1 Day for General Customisations and Training – 1 day

   

Total Services: - 3 days = £450 x 3 = £1350

   

TOTAL PRICE ex vat: - £5000+£1000+£1350 = £7350

     

Please note if any of the above Service time is not used, it will not be charged.
Latest News

New Release Of Qload

The latest release of Qload now integrates fully with a Document management system allowing user in Qload to retreive the POD attached to a docket.  There will be no excuse for your customer not to pay when you have proof that they received the goods.

Proccess Sage 50 Invoices using google checkout 

Send your customer google invoices directly from sage 50.  They can pay the invoices online and the money simply appears in your bank account.

Use sage CRM with sage 50 

Sage CRM is was designed to work with sage 200 and some of the other larger sage packages but we have adapted it so that it will now work with Sage 50.